Find or Sell any Parts for Your Vehicle in USA

Arias Pistons 12.5:1 Compression 82mm Bore Honda B-series on 2040-parts.com

US $499.99
Location:

Orlando, Florida, United States

Orlando, Florida, United States
Condition:New Brand:Arias Manufacturer Part Number:3330420

Categories
WHY CHOOSE US
Arias Pistons 12.5:1 Compression 82mm bore Honda B-Series
Description

Honda/Acura B18c1 DOHC VTEC 
1.8L 
Stock Bore: 82mm
Stroke: 3.433
Rod: 5.430
Head CC: 41.6
Gasket: .028
Deck: .005
Compression Height: 1.180
Dome CC: 6
Compression Ration with Stock Head: 12.5:1 
Required Ring set: 1012303228



Payment is accepted only through Paypal.

We will only ship to the Paypal confirmed shipping address.

Payment for orders should be made within 5 business days.

Sales tax will be charged for orders from Florida.

If you require another payment arrangement, please contact us by email or eBay seller messages.
You may also like this

Porsche Boxster

Mon, 16 Jan 2012

The Porsche Boxster has been completely redesigned as it enters its third generation since its introduction in 1996. As can be expected from the Stuttgart manufacturer, the design is progressive, evolving the familiar two-seater into a more distinctive proposition within the Porsche range. Its proportions are also altered, with a flatter silhouette and shorter overhangs, while the base of the windscreen has been significantly shifted forward.

Lexus RX: The strong get stronger

Wed, 07 Jan 2009

If you've loved the Lexus RX for the past decade, you won't be able to keep your hands off the new one. This third-gen soft-ute does everything for which it has been celebrated--providing a stylish, nontruck experience, lathered with luxury froth and festooned with technical widgets--and does it better than ever. This is no mere facelift.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.